We’re navigating through a diverse range of geological conditions – including rock and clay – at a depth of 25 meters, where we encounter high water pressure and a host of complex challenges.
Currently, we have successfully completed 300 meters of the tunnel. Our operations are not only proceeding smoothly but are also slightly ahead of schedule. This advancement is a testament to our team’s expertise and dedication to overcoming obstacles, thereby ensuring the project’s contribution to the region’s long-term sustainability and resilience of its clean water systems.
Location
- Phnom Penh, Cambodia
Equipment/TBM
- Herrenknecht AVN 2000 with D-mode chamber
Positions Supplied
- Construction manager x 1, Site supervisor x 1, Electro mechanic x 1, TBM operator x 1, TBM mechanic x1