Whitby Woodsmith Polyhalite Mine

Our team were responsible for operation and maintenance of the first VSM delivered to the UK for a record-breaking excavation of 120m. VSMs are very well suited to projects with a groundwater table above bedrock. Pressure is balanced both inside and outside the shaft through conservation of precise water pressure, eliminating the risk of blowouts from below.

Whitby Woodsmith Polyhalite Mine

Our team were responsible for operation and maintenance of the first VSM delivered to the UK for a record-breaking excavation of 120m. VSMs are very well suited to projects with a groundwater table above bedrock. Pressure is balanced both inside and outside the shaft through conservation of precise water pressure, eliminating the risk of blowouts from below.

Location

Equipment/TBM

Positions Supplied