Montpellier Sewer Upgrade

We provided our client with comprehensive support in establishing the job site over a two-week period, during which we conducted thorough testing and commissioning of the HK AVN 2000 TBM. This preparatory work was essential for the forthcoming construction of a 252-meter tunnel, ensuring all systems were operational and met the highest standards of performance and safety.

Montpellier Sewer Upgrade

We provided our client with comprehensive support in establishing the job site over a two-week period, during which we conducted thorough testing and commissioning of the HK AVN 2000 TBM. This preparatory work was essential for the forthcoming construction of a 252-meter tunnel, ensuring all systems were operational and met the highest standards of performance and safety.

Location

Equipment/TBM

Positions Supplied