Discover the tunnelling projects we’ve completed, including the location, which equipment we used and which positions we supplied.

Completed Projects

Cannes Sewer Improvements

Our team provided expert assistance to our client in drilling a 350-meter section through a complex stratigraphy comprising both clay and rock formations. This required a nuanced approach to address the variable geotechnical conditions and ensure the integrity of the drilling operation.

Read More
Completed Projects

Montpellier Sewer Upgrade

We provided our client with comprehensive support in establishing the job site over a two-week period, during which we conducted thorough testing and commissioning of the HK AVN 2000 TBM. This preparatory work was essential for the forthcoming construction of a 252-meter tunnel, ensuring all systems were operational and met the highest standards of performance and safety.

Read More
Completed Projects

NeuConnect Project with Prysmian & Siemens Energy

Our firm provided technical expertise to our client in the successful completion of three 437-meter drilling operations, utilizing 8-inch drill pipes. This critical phase forms part of the ambitious 2.8 billion Euro subsea interconnector project, which is designed to facilitate a bi-directional electricity flow of up to 1.4 gigawatts between the United Kingdom and Germany. The project is on track for operational status by 2028, significantly enhancing the energy transfer capabilities and grid stability of both nations.

Read More
Completed Projects

ARGE Pipeline in Brunsbüttel

We supported our client in the execution of 16 micro-tunnelling crossings over the span of a four-month project. This operation was carried out in notably soft geological conditions as part of the construction of an ARGE pipeline in Brunsbüttel, Northern Germany.

Read More
Completed Projects

Weert Sewer Upgrade Project

We provided our client with expert assistance in the installation of a 116-meter AVN 1200 pipeline, which was a critical component of a sewer upgrade project. This was successfully executed in the advantageous tunnelling conditions presented by the sandy geological landscape.

Read More
Completed Projects

Constanța Sewer Upgrade Project

Our team provided expert assistance to our client for the installation of two 170-meter AVN 1200 tunnels as part of a crucial sewer upgrade project in Constanta, Romania. The geological conditions were particularly demanding due to the presence of fine, soft silt. Despite these challenges, the job was executed to a high standard, achieving an impressive rate of production. This project was essential for enhancing the city’s wastewater management system, ensuring better environmental protection and improving the overall infrastructure resilience.

Read More
Completed Projects

LNG Pipeline in Stade

In the Dow compound in Stade, we worked on this important government-sponsored project enhancing the region’s energy network. We completed three micro tunnels with lengths of 12m, 24m, and 48m respectively, alongside a 36m auger crossing. Additionally we completed four pilot drillings, with lengths of 12m, 24m, 48m, and 36m.

Read More
The TBM used in this phase of the Clonburris Infrastructure Development project
Completed Projects

Clonburris Infrastructure Development

We provided three expert TBM operators and two skilled TBM mechanics on this expansive and ambitious project that blends infrastructural excellence and community-building in Dublin. We worked on two micro tunnels of 48m and 89m through challenging bedrock in the invert and sticky clay above. Prioritising high production rate, we adopted a two-shift system – working day and night – and finished ahead of the timeline by two days, completing all tasks in a remarkable 28 days.

Read More
Completed Projects

DN2500 under the Seine in Paris

We are assisting BESSAC on their joint venture project with La SADE in Paris, helping them to achieve a distance of 980 meters of tunnelling though chalk and clay for DN2500 size pipe.

Read More
Completed Projects

NYC MTA Sewer Replacement

We successfully completed three tunnels of 240m, 120m and 72m and are currently working on a third of 250m in very wet sand and silt, working in an extremely busy and dense urban environment next to Manhattan’s express rail system.

Read More